Home
>
Mooring Equipment
>
Wire
>
Drum Layering
Drum Layering
CORRECT/INCORRECT LAYERING
When working with long lengths of wire it is essential that the wires are spooled onto the winches correctly. Wires should be installed using spooling machines that can apply back tension to the winch. It is also important to check whether the winch is over or under wound, for left or for right stranded wire rope.
The application of tension and the employment of correct spooling techniques will ensure that the wraps of wire will nestle neatly and tightly when spooled onto a winch. If wire is spooled slackly, or incorrectly placed on the winch, it will result in damaged wire. If an outer layer is pulled through the inner wraps towards the core of the drum it can result in the wire being cut.
Home
About Us
Locations
Management
Strategy
News
Partners
Vacancies
Social Responsibility
CONTACT US
Downloads
Site Map
Services
Rental services
Chain Inspection
wire sales
Spooling services
Mooring Engineering
Scope of Work
Vessel Mooring
Load testing
Mooring Equipment
Anchors
Chain
Kenters & connectors
Wire
Chaser and grapnels
Fibre Rope
Shackles
Buoys
Swivels
SPIN Buoy
HSEQ
Vision
Policy & Core Values
Certifications
R & D
Fibre rope splicing
Multidog
SPIN Buoy
QS Connector
RigMove
News